Sneak preview of our second Oyster
20 Jun 11 - Jon Hancock, Structural Engineer
As you can see from the above picture our second full-scale
Oyster is really taking shape now, ready for installation in Orkney
this summer. This sneak preview photo shows the top three
tubes of the device which are fresh out of the paint shop. The top
tube is painted yellow so it can be seen by any vessels in the
area. Watch out for the full unveiling of Oyster in
July...