Blog

Sneak preview of our second Oyster

20 Jun 11 - Jon Hancock, Structural Engineer

Oyster 800 wave energy converter

As you can see from the above picture our second full-scale Oyster is really taking shape now, ready for installation in Orkney this summer.  This sneak preview photo shows the top three tubes of the device which are fresh out of the paint shop. The top tube is painted yellow so it can be seen by any vessels in the area.  Watch out for the full unveiling of Oyster in July...